Size power supplies, UPS modules or PDUs for a redundancy scheme and see each unit's load in normal operation and after a failure.

Results

Units required (N)
2
Units installed (N+1)
3
Installed capacity
60 kW
Load per unit, normal
50%
Load per unit after one failure
75%
Unit failures tolerated
1

What it calculates

  • Units required
  • Installed capacity
  • Load per unit (normal)
  • Load per unit after failure

Worked example

Using the default inputs below; change any input above to recalculate.

Inputs
Load30 kW
Capacity per unit20 kW
SchemeN+1
Results
Units required (N)2calculated
Units installed (N+1)3calculated
Installed capacity60 kWcalculated
Load per unit, normal50%calculated
Load per unit after one failure75%calculated
Unit failures tolerated1calculated

Methodology

N is the number of units needed to carry the load. N+x adds x spare units; 2N duplicates the full set (two independent paths); 2N+1 adds one more.

Formulas

N
N = ⌈load ÷ unit_capacity⌉

Assumptions

  • Load is shared equally across healthy units.

Limitations

  • 2N assumes independent distribution paths; shared upstream components remain single points of failure.