Research Lab & University HPC Planner

Size shared research compute from people and usage: monthly GPU-hours or core-hours demand, peak concurrency and target utilisation give the accelerators or cores needed, then servers, power, energy cost and — if you enter a server price — capital cost.

Results

GPUs by monthly demand
13
GPUs by peak concurrency
20
GPUs required
20
Servers
3
IT power (max)
18 kW
Annual energy cost
₹12.3 lakh

What it calculates

  • Resource units needed (GPUs or cores)
  • Servers
  • Power
  • Annual energy cost
  • Capital cost

Worked example

Using the default inputs below; change any input above to recalculate.

Inputs
ResourceGPUs
Researchers40
Hours per researcher per month (GPU-hours or core-hours)150
Peak simultaneous users25 %
Units per active user at peak2
Target utilisation65 %
Units per server8
Power per server6 kW
Server price (optional)0 ₹
PUE1.5
Tariff8 ₹/kWh
Results
GPUs by monthly demand13calculated
GPUs by peak concurrency20calculated
GPUs required20calculated
Servers3calculated
IT power (max)18 kWcalculated
Annual energy cost₹12.3 lakhestimated

Methodology

Demand-based sizing: units = monthly unit-hours ÷ (730 hours × target utilisation). Peak-based sizing: simultaneous users × units each. The larger wins; servers, power and energy follow.

Formulas

Demand
U = users × hours ÷ (730 × utilisation)

Assumptions

  • 730 hours per month.

Limitations

  • Deadline-driven bursts (paper or thesis submissions) may need extra headroom or cloud bursting.